注冊 | 登錄讀書好,好讀書,讀好書!
讀書網(wǎng)-DuShu.com
當(dāng)前位置: 首頁出版圖書科學(xué)技術(shù)計算機/網(wǎng)絡(luò)軟件工程及軟件方法學(xué)統(tǒng)一過程精解(影印版)

統(tǒng)一過程精解(影印版)

統(tǒng)一過程精解(影印版)

定 價:¥19.00

作 者: (美)Kendall Scott著
出版社: 清華大學(xué)出版社
叢編項: 軟件工程實踐叢書
標 簽: 暫缺

ISBN: 9787302082675 出版時間: 2005-04-01 包裝: 平裝
開本: 21cm 頁數(shù): 185 字數(shù):  

內(nèi)容簡介

  Many of the designations used by manufacturers and sellers to distinguish theri products are claimed as trademarks. Where those designatioins appear in this book, and Addison-Wesley was aware of a trademark claim, the designations have been printed with initial capital letters or in all cpitals.The author and publisher have taken care in the preparation of this book, but make no expressed or implied warranty of any kind and assume no responsibility for errors or omissions. No liability is assumed for incidental or consequential damages in connection with osr arising out of the use of the information or programs contained herein.

作者簡介

  the designations have been printed with initial capital letters or in all cpitals. The author and publisher have taken care in the preparation of this book

圖書目錄

List of Figures
Preface
Why This Book?
Organization of This Book
Acknowledgments
Chapter 1:Overview
Introduction
History
Use Case Driven
Architecture-Centric
Understanding the Big Picture
Organizing the Development Effort
Facilitating the Possibilities for Reuse
Evolving the System
Guiding the Use Cases
Iterative and Incremental
Logical Progress Toward a Robust Architecture
Dealing With Ongoing Changes in Requirements
Greater Flexibility to Change the Plan
Continuous Integration
Early Understanding
Ongoing Focus on Risk
The Four Phases
Inception
Elaboration
Construction
Transition
The Five Workflows
Requirements
Analysis
Design
Implementation
Test
Iteration and Increments
Artifacts,Workers,and Activities
Artifacts
Workers
Activities
Chapter 2:The Requirements Workflow
Introduction
Reach Agreement on the System Context
List Candidate Requirements
Identify and Negotiate Functional Requirements
Specify Nonfunctional Requirements
Artifacts
Domain Model
Business Model
Glossary
Actor
Use Case
User-Interface Prototype
Use Case Model
Architecture Description(View of the Use Case Model)
Supplementary Requirements
Workers
System Analyst
Use Case Specifier
User-Interface Designer
Architect
Activities
Build the Domain Model
Build the Business Model
Find Actors and Use Cases
Prototype the User Interface
Prioritize the Use Cases
Detail a Use Case
Structure the Use Case Model
Chapter 3:The Analysis Workflow
Introduction
Artifacts
Analysis Class
Use Case Realization-Analysis
Analysis Package
Analysis Model
Architecture Description(View of the Analysis Model)
Workers
Architect
Use Case Engineer
Component Engineer
Activities
Perform Architectural Analysis
Analyze a Use Case
Analyze a Class
Analyze a Package
Chapter 4 The Design Workflow
Introduction
Artifacts
Design Class
Use Case Realization-Design
Interface
Design Subsystem
Design Model
Architecture Description(View of the Design Model)
Deployment Model
Architecture Description(View of the Deployment Model)
Workers
Architect
Use Case Engineer
Component Engineer
Activities
Perform Architectural Design
Design a Use Case
Design a Class
Design a Subsystem
Chapter 5:The Implementation Workflow
Introduction
Artifacts
Component
Interface
Implementation Subsystem
Implementation Model
Architecture Description (View of the Implementation Model)
Integration Build Plan
Workers
Architect
Component Engineer
System Integrator
Activities
Perform Architectural Implementation
Implement a Class
Perform Unit Test
Implement a Subsystem
Integrate the System
Chapter 6:The Test Workflow
Introduction
Artifacts
Test Case
Test Procedure
Test Component
Test Model
Test Plan
Defect
Test Evaluation
Workers
Test Engineer
Component Engineer
Integration Tester
System Tester
Activities
Plan Test
Design Test
Implement Test
Perform Integration Test
Perform System Test
Evaluate Test
Chapter 7:The Inception Phase
Introduction
Getting Started
Plan the Inception Phase
Expand the System Vision
Establish the Evaluation Criteria
Requirements Activities
Build the Domain Model
Build the Business Model
Find Actors and Use Cases
Prioritize the Sue Cases
Detail a Use Case
Analysis Activities
Perform Architectural Analysis
Analyze a Use Case
Design Activities
Perform Architectural Design
Taking Stock
Assess Each Iteration
Assess the Phase as a Whole
Looking Ahead
Make the Initial Business Case
Do Initial Planning for the Elaboration Phase
Chapter 8:The Elaboration Phase
Introduction
Getting Started
Plan the Elaboration Phase
Establish the Evaluation Criteria
Requirements Activities
Build the Domain Model
Build the Business Model
Find Actors and Use Cases
Prototype the User Interface
Prioritize the Use Cases
Detail a Use Case
Structure the Use Case Model
Analysis Activities
Perform Architectural Analysis
Analyze a Use Case
Analyze a Class
Analyze a Package
Design Activities
Perform Architectural Design
Design a Use Case
Design a Class
Design a Subsystem
Implementation Activities
Perform Architectural Implementation
Implement a Class
Perform Unit Test
Implement a Subsystem
Integrate the System
Test Activities
Plan Test
Design Test
Implement Test
Perform Integration Test
Perform System Test
Evaluate Test
Taking Stock
Assess Each Iteration
Assess the Phase as a Whole
Looking Ahead
Make the Full Business Case
Do Initial Planning for the Construction Phase
Chapter 9:The Construction Phase
Introduction
Getting Started
Plan the Construction Phase
Establish the Evaluation Criteria
Requirements Activities
Find Actors and Use Cases
Prototype the User Interface
Prioritize the Use Cases
Detail a Use Case
Structure the Use Case Model
Analysis Activities
Perform Architectural Analysis
Analyze a Use Case
Analyze a Class
Analyze a Package
Design Activities
Perform Architectural Design
Design a Use Case
Design a Class
Design a Subsystem
Implementation Activities
Implement a Class
Perform Unit Test
Implement a Subsystem
Integrate the System
Test Activities
Plan Test
Design Test
Implement Test
Perform Integration Test
Perform System Test
Evaluate Test
Taking Stock
Assess Each Iteration
Assess the Phase as a Whole
Looking Ahead
Do Initial Planning for the Transition Phase
Chapter 10:The Transition Phase
Introduction
Getting Started
Plan the Transition Phase
Establish the Evaluation Criteria
Activities
Get the Beta Release Out
Install the Beta Release
Respond to Test Results
Adapt the Product to Varied User Environments
Complete the Artifacts
Taking Stock
Assess Each Iteration
Assess the Phase as a Whole
Looking Ahead
Complete the Business Case
Do a Postmortem for the Project
Plan the Next Release or Generation
Appendix A: The Rational Unified Process
Workflows
Project Management
Business Modeling
Requirements
Analysis and Design
Implementation
Test
Configuration and Change Management
Environment
Deployment
Artifact Sets
Workers
Appendix B:Extreme Programming and the RUP
A High-Level View of XP
Values
Fundamental Principles
Development Practices
XP and the RUP:Common Ground
XP and the RUP:Key Differences
So,Is XP and Instance of the RUP Or Not?
Appendix C:The ICONIX Process
Bibliography
Glossary
Index

本目錄推薦

掃描二維碼
Copyright ? 讀書網(wǎng) hotzeplotz.com 2005-2020, All Rights Reserved.
鄂ICP備15019699號 鄂公網(wǎng)安備 42010302001612號